Welcome Customer !

Membership

Help

Zhucheng Aofeng Environmental Protection Equipment Co., Ltd
Custom manufacturer

Main Products:

foodequippro>Products
Product Categories

Zhucheng Aofeng Environmental Protection Equipment Co., Ltd

  • E-mail

  • Phone

    187-5448-8768

  • Address

    200 meters west of the intersection of National Highway 206 and Shunyuan Road in Zhucheng City, Shandong Province

Contact Now

Integrated sewage treatment equipment for daily life

NegotiableUpdate on 04/29
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Integrated sewage treatment equipment for daily life

Product Details


Introduction:
The removal of organic pollutants and ammonia nitrogen by integrated sewage treatment equipment mainly relies on the AO biological treatment process in the equipment.
The working principle is at level A. Due to the high concentration of organic matter in sewage, microorganisms are in a state of hypoxia. At this time, microorganisms are facultative microorganisms. Therefore, level A tanks not only have a certain function of removing organic matter, reducing the organic load on subsequent aerobic tanks, and reducing the concentration of organic matter, but there is still a certain amount of organic matter and high NH3-N present.
In order to further oxidize and decompose organic matter, and ensure smooth nitrification under carbonization, an aerobic biological contact oxidation tank with low organic load is set up at level O.
There are mainly aerobic microorganisms and autotrophic bacteria (nitrifying bacteria) in the O-level pool. Aerobic microorganisms decompose organic matter into CO2 and H2O; Autotrophic bacteria (nitrifying bacteria) use inorganic carbon produced by the decomposition of organic matter or CO2 in the air as a nutrient source to convert NH3-N in wastewater into NO-2-N and NO-3-N. The effluent from the O-grade pool is returned to the A-grade pool, providing an electron acceptor for the A-grade pool, and ultimately eliminating nitrogen pollution through denitrification.
Technical Specifications:
1. Main equipment (manufacturer designs size according to actual situation)
2. Fan
3. Sewage lifting pump
4. Sludge pump
5. Boosting pump
6. Chlorine dioxide generator (disinfection equipment)

Equipment parameters:
model AFDM1 AFDM2 AFDM3 AFDM5 AFDM7 AFDM10 AFDM15 AFDM20
processing capacity 1 2 3 5 7 10 15 20
Number of pieces (pieces) 1 1 1 1 2 3 3 4
fan air volume
㎡/h
0.31 0.59 0.67 1.02 1.72 2.5 4.11 4.11
wind pressure
m.mH2O
5000 5000 5000 5000 5000 5000 5000 5000
power
KW
0.55 0.75 1.5 1.5 1.5 2.2 3.7 5.5
water pump Flow rate m ³ 1 2 3 5 7 10 15 20
Head m 8 8 8 8 8 8 8 8
Power KW 0.55 0.55 0.55 0.75 0.75 0.75 0.75 1.5
area 6 10 14 19 28 39 58 75