Welcome Customer !

Membership

Help

Zhangjiagang Keyuan Machinery Co., Ltd
Custom manufacturer

Main Products:

foodequippro>Products

Zhangjiagang Keyuan Machinery Co., Ltd

  • E-mail

    2843133928@qq.com

  • Phone

    18020234992

  • Address

    20 Sanxing Yucai Road, Jinfeng Town, Zhangjiagang City, Jiangsu Province

Contact Now

Fully automatic bottled water mountain spring water drinking water production line equipment

NegotiableUpdate on 01/22
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The fully automatic bottled water mountain spring water drinking water production line equipment filling production line consists of water treatment, blow molding machine, bottle sorting machine, air delivery system, three in one filling machine (bottle flushing, filling, sealing), blow drying machine, shrink labeling machine (labeling machine), shrink film packaging machine (packing machine), palletizing machine, conveyor line, etc.

Product Details

  Fully automatic bottled water mountain spring water drinking water production line equipment
Basic introduction: Our bottled water canning equipment realizes three processes of bottle flushing, filling, and sealing on one machine, which shortens the contact time between materials and the outside world, improves hygiene conditions, and has a suspended bottle mouth conveying bottle structure, making it more convenient to change bottle types Fast and labor-saving, the host adopts PLC programmable automatic control technology, and key electrical components are all products of * * * products.
全自动瓶装水  山泉水 饮用水生产线设备
Scope of application: Suitable for the production of pure water, mineral water, mountain spring water, natural water and other non carbonated bottled water packaged in PET bottles.
Product Features:
1. The bottle inlet duct adopts a hanging card bottleneck method, which allows for fast bottle loading without causing deformation of the bottle.
2. The adjustment of applicable bottle shapes for each part is easy and convenient.
3. The touch screen designed with a humanized concept is easy to operate and can achieve human-machine dialogue operation.
4. Except for the rack, the entire machine is made of high-quality stainless steel, which runs smoothly, without vibration, dead corners in the process, and is easy to clean.
5. The high-speed filling valve of * * * ensures accurate liquid level without liquid loss, achieving no bottle filling.
6. The programmable logic controller (PLC) realizes the automation control of the entire production process, with convenient operation and high degree of automation.
7. The human-machine control system can achieve functions such as missing lid detection, production speed control, output counting, and automatic stopping of stuck bottles.
8. A comprehensive overload protection device can * * * protect the safety of operators and equipment.
9. Using a magnetic constant torque sealing head device to ensure sealing quality and prevent damage to the bottle cap.
10. Adopting an efficient lid system with complete self-control and protection devices.
全自动瓶装水  山泉水 饮用水生产线设备
Zhangjiagang Beverage Machinery Manufacturer of Fully Automatic Small Mineral Water Production Line
Product Features:
Customized processing and production can be achieved according to customer requirements, including turnkey projects for filling production lines of mineral water, purified water, large barrel water, fruit juice beverages, carbonated beverages, sparkling wine, plant protein, etc., with a production capacity of 2000-36000 bottles/hour.
Composition of bottled water filling production line:
Water treatment, bottle blowing machine, bottle sorting machine, air delivery system, three in one filling machine (bottle flushing, filling, sealing), blow drying machine, shrink label machine (labeling machine), shrink film packaging machine (packing machine), palletizing machine, conveyor line, etc.
全自动瓶装水  山泉水 饮用水生产线设备
Fully automatic bottled water mountain spring water drinking water production line equipment
全自动瓶装水  山泉水 饮用水生产线设备
Must see for buyers: Analysis of production costs and profits for opening large and small bottled water
Setting up a purified water or mineral water plant not only requires certain requirements for the factory environment, but also needs to configure different production equipment according to the needs of users. A reasonable producer of purified water plants or mineral water plants can produce water quality and quantity, as well as ensure the normal operation of the water plant. Therefore, the establishment of pure water plants and mineral water plants requires careful and systematic planning, detailed investment budgets, and more specific cost analysis. Zhangjiagang Keyuan Machinery summarizes the profits of small bottled pure mineral water and large barrel bottled mineral water plants as follows:
  1、 Cost analysisAt the initial stage, based on a daily sales volume of 200 barrels, the direct production cost per barrel of water is as follows:
Electricity fee: 2.2KW/hour x 12 hours/day x 0.60 yuan/KW=15.8 yuan/day,
Rent: 3000 yuan/year x 1/365=8.2 yuan/day,
Decoration: 2000 yuan/year x 1/365=5.5 yuan/day,
Water fee: (If using groundwater, only electricity fee is required)
0.75kw/hour × 12 hours=9KW × 6=5.4 yuan/day
Bucket lid: 0.18 yuan/piece x 200 pieces/day=36 yuan/day,
Bucket lid stickers: 0.05 yuan/piece x 200 pieces/day=7.5 yuan/day,
Bucket bag: 0.10 yuan/piece x 200 pieces/day=20 yuan/day,
Heat shrink sealing film: 0.05 yuan/piece x 150 pieces/day=7.5 yuan/day,
Tax (fixed tax): 1200 yuan/year x 1/365=3.28 yuan/day,
Total cost: 101.68 yuan,
Comprehensive cost per barrel: 101.68 yuan ÷ 200 barrels=0.51 yuan/barrel.
  2、 Profit analysis of bottled purified water/mineral waterDaily gross income: 7 yuan/barrel x 200 barrels=1400 yuan/day, 2 workers' wages: 60 yuan/person x 2 people=120 yuan, daily net income: 1400 yuan -101.68 yuan -120 yuan=1298.32 yuan,
Monthly profit: 1298.32 yuan x 30 days=38949.6 yuan,
Annual net income: 38949.6 yuan x December=467395.2 yuan.
Benefit analysis:
According to this calculation, it only takes two months to recover the entire investment. Considering that the production and sales volume of bottled water increases significantly in the first few months and steadily increases after a few months, and the production and sales volume will continue to increase in inverse proportion to the production and sales volume, the larger the production and sales volume, the lower the comprehensive operating cost. In fact, from the perspective of the operating conditions of pure water plants, the vast majority of them can achieve a daily sales volume of about 200 barrels after one month of operation. Theoretically, it takes two months of normal operation to recover all the investment in bottled water. Due to differences in actual conditions in each region, the selling price of bottled water also varies, with an annual profit of 150000 to 300000 yuan, which is achievable by most pure water plants.
  3、 Cost accounting of bottled water:(Calculated at 550ml/bottle * 1 * 24 bottles/piece)
1. Bottle: 0.011 yuan/gram * 15g * 24 bottles=3.96 yuan
2. Bottle cap: 0.03 yuan/piece * 24=0.72 yuan
3. Trademark: 0.013 yuan/piece * 24=0.312 yuan
4. Labor wage: 0.6 yuan/box
5. Electricity fee: 0.4 yuan/box
6. Packaging film: 0.70 yuan/piece
The total production cost of a small bottle of water is 0.278 yuan
Total production cost of one box of bottled water: 6.692 yuan
Benefit analysis: Based on this data analysis and calculation, for a small bottle water production line with an hourly output of 2000-2500 bottles, the hourly output is calculated as 2000 bottles/24 bottles=83.3 pieces based on a minimum of 2000. The daily production is calculated as 12 hours,
83.3 × 12=999.6 (approximately 1000 pieces). The external cost of a bottled purified water is 12 yuan, with a single profit of 12-6.692=5.308 yuan, a daily profit of 5.308 * 1000=5308 yuan, and a monthly profit of 5208 * 30=159240 yuan. Excluding business expenses (phone bills), 15924-500=158740 yuan. From an investment perspective, it can be seen that a purified water plant is a typical investment project with low investment, fast effect, * * *, and * * *.
  4、 Requirements for site environment, personnel, and water sourcesRequire a factory building of approximately 100-150 square meters, divided into production workshop, filling workshop, finished product workshop, empty barrel (bottle) storage workshop, and laboratory. The floor and walls should be paved with white tiles and wall tiles to prevent mosquitoes from entering. Require a 380V power supply. The operator is in good health, free from infectious diseases, and has obtained a health certificate issued by the health and epidemic prevention station. There is municipal tap water, and if groundwater is used, there are no sources of "three wastes" pollution around the water intake point.
  5、 Equipment configuration and production related license requirementsThe basic requirements for equipment configuration are as follows: stainless steel raw water tank, RO commercial reverse osmosis host, 304 stainless steel pure water tank, ozone sterilizer, UV lamp sterilizer, canning machine, capping machine, disinfection equipment, etc. If you want to obtain QS certification, you need to add: microscope, acidimeter, incubator, turbidity meter, sterilization pot, drying oven, analytical balance, air purification, air shower room. The country has a unified implementation standard for bottled purified water, namely GB17324-2003 "Hygienic Standards for Bottled Drinking Purified Water", and has obtained QS quality certification.
全自动瓶装水  山泉水 饮用水生产线设备
全自动瓶装水  山泉水 饮用水生产线设备