-
E-mail
1311327132@qq.com
-
Phone
18037316198
-
Address
No. 20 Bosong Road, Jinshui District, Zhengzhou City
Zhengzhou Ansheng Scientific Instrument Co., Ltd
1311327132@qq.com
18037316198
No. 20 Bosong Road, Jinshui District, Zhengzhou City
Operating Procedures for Hefei Box type Resistance Furnace (Artificial Intelligence)
1) Check the condition of the electric furnace and turn on the power switch;
2) Set temperature system
① Press the<key once to enter the temperature program setting state of the instrument. At this time, the temperature control meter's measurement value display window shows C-01, and the parameter value display window shows temperature. You can set the starting temperature (usually room temperature) by pressing the<, ∧, and ∨ keys.
② Press the SET button once, and the temperature control meter's measurement value display window will show t-01, while the parameter value display window will show the time. You can set the heating time for segment * by pressing<∧∨.
③ Press the SET button again, and the temperature control meter's measurement value display window will show C-02, while the parameter value display window will show temperature. You can set the end temperature of segment * (i.e. the starting temperature of the second segment) by pressing<∧∨.
④ Press the SET button again, and the temperature control meter measurement value display window will show t-02. The parameter value display window will show the time. You can set the second heating time by pressing<∧∨.
⑤ Press the SET button again, and the temperature control meter's measurement value display window will show C-03, while the parameter value display window will show temperature. You can set the end temperature of the second segment (i.e. the starting temperature of the third segment) by pressing<∧∨.
Press the SET key in sequence to set the temperature and time for the nth segment
⑥ When the program terminates, set the next period of time to -121. At this time, when the operation ends, the power will be automatically cut off and the furnace will cool down.
⑦ After the program is set, press the SET and<keys simultaneously to exit the program setting state, or if there is no action for 15 seconds, you can exit by yourself.
⑧ Program running, long press the ∨ key for 2 seconds, the parameter window displays' run ', entering program running. During program running, long press the ∨ key for 2 seconds, the parameter window displays' PE', and the program pauses.
⑨ Program termination, long press the ∧ key for 2 seconds, the parameter window displays End, the program ends, and all outputs are closed.
Specification parameters:
model |
AS-1400 |
Temperature parameters |
1400℃ |
Voltage AC |
220V/380V |
rated temperature |
1400℃ |
Long term working temperature |
1350℃ |
Uniformity of temperature field inside the furnace |
±5℃ (depending on the size of the heating chamber) |
Temperature measuring components and temperature measuring range |
Platinum rhodium platinum S temperature measurement range 0-1700 ℃ |
Program curve segment |
30 paragraphs |
heating rate |
1 ℃/h-40 ℃/min, recommended 20 ℃/min |
Heating element |
Elema |
Thermal insulation material |
Imported high-purity alumina fiberboard |
Cooling method |
Double layered furnace shell, air-cooled |
Furnace body temperature |
≤ 50 degrees |
Warranty scope and duration |
The electric furnace comes with a one-year free warranty, and the heating element is not covered by the warranty (natural damage within three months can be replaced free of charge) |
Customer selection |
1. Crucible, box bowl, corundum furnace pad/silicon carbide pad 2. RS485 communication, computer control software and hardware 3. Touch screen controlled temperature controller 4. Paperless recorder 5. Increase exhaust ports 6. Consumables: Heating elements, temperature measuring components 7. Increase observation ports and endoscopes |
Furnace specifications:
specifications |
Furnace dimensions (depth, width, height mm) |
voltage |
Power kw |
PID instrumentControl accuracy |
A |
100x100x100 |
220 |
1 |
±1 |
B |
150X100X100 |
220 |
1.5 |
±1 |
C |
200X150X150 |
220 |
2 |
±1 |
D |
300X200X120 |
220 |
4 |
±1 |
E |
200×200×200 |
220 |
6 |
±1 |
F |
300×200×200 |
220 |
8 |
±1 |
G |
300X250X250 |
220/380 |
8 |
±1 |
H |
300×300×300 |
220/380 |
10 |
±1 |
I |
400X250X160 |
220/380 |
8 |
±1 |
J |
400×300×300 |
220/380 |
12 |
±1 |
K |
500×300×200 |
220/380 |
15 |
±1 |
L |
500×300×300 |
380 |
18 |
±1 |
M |
500X400X400 |
380 |
20 |
±1 |
N |
500×500×500 |
380 |
25 |
±1 |
U |
800×500×500 |
380 |
40 |
±1 |
V |
1200×500×500 |
380 |
85 |
±1 |
W |
1200×800×800 |
380 |
110 |
±1 |
Hefei Box type Resistance Furnace (Artificial Intelligence)Special furnace dimensions can be customized according to customer requirements!
The correct operation process of high-temperature box type resistance furnace
The specific process operation of the box type resistance furnace is as follows:
1. Check the "shift handover record" before starting work.
2. Operators should wear the prescribed protective equipment and be familiar with the "safety operating procedures".
3. Check the lubrication condition of the axle and slide rail of the furnace door opening mechanism.
4. Check the installation and fastening of the furnace lining, resistance wire, and thermocouple lead out rod, and verify if the instruments are functioning properly.
5. Check that the resistance wires at the bottom of the furnace, the bottom plate of the furnace, the transmission mechanism of the movable furnace bottom, and the motor lead wires are in good condition.
6. Check the cleanliness of the furnace and clean the oxide scale.
7. Newly repaired furnaces should be dried according to the "process specifications".
8. Cut off the power and proceed with the baking process according to the "process specifications".
9. Close the door of the box type resistance furnace.
10. Insulate according to the "process regulations".
11. Power on heating.
12. Cut off the power after work.
13. Produce the furnace according to the "process specifications".
14. Reinstall the furnace and repeat the above procedure.
When the box type resistance furnace is operated continuously, the "handover record" must be carefully filled out, and the handover must be clearly handed over to the successor in person.
16. Maintain and upkeep the equipment according to the "Equipment Maintenance Regulations".