Part: Product Usage and Production Basis
The product is used for:
A.This equipment is mainly designed for adaptability testing of electrical and electronic products, their raw components, and other materials during storage, transportation, and use in high and low temperature environments.
B. This testing equipment is mainly used to conduct environmental simulation tests on the physical and other related characteristics of products under low and high temperature conditions in accordance with national standards or user defined requirements. After testing, the performance of the product is judged through inspection to determine whether it can still meet the predetermined requirements, for product design, improvement, identification, and factory inspection purposes
C.As a reliability testing equipment for quality control engineering, it is used to test the high and low temperature performance of electrical, electronic, and other non flammable and explosive materials. (Applicable to all industries: electronic components, such as capacitors, inductors, resistors, diodes, transistors, etc.; electrical appliances, such as telephones, fax machines, automotive parts and electrical products; plastics, such as plastic shells, plastic products, etc., especially suitable for high and low temperature resistance tests of optical fibers, LCDs, crystals, photovoltaic modules, batteries, computers, mobile phones and other products.). )
D is suitable for the cold, heat, and dry resistance tests conducted during the research and development of various electronic, electrical, appliance, plastic and other raw materials and devices. As the basis for developing products that are resistant to high and low temperatures.
This device is produced according to the following standards or a combination thereof
GB 10589-2008Technical Conditions for Low Temperature Test Chamber
GB 11158-2008Technical Conditions for High Temperature Test Chamber
GB 10592-2008Technical Conditions for High and Low Temperature Test Chambers
GB2423.1-2008Basic Test Procedures for Electrical and Electronic Products - Test A: Low Temperature Test Method
GB2423.2-2008Basic Test Procedures for Electrical and Electronic Products - Test B: High Temperature Test Method
GB2423.4-2008Basic Test Procedures for Electrical and Electronic Products - Test Db: Alternating Current Test Method
GB2424.1-2005Basic Environmental Testing Procedures for Electrical and Electronic Products - Guidelines for High Temperature and Low Temperature Testing
GB2423.22-2008Basic Test Procedures for Electrical and Electronic Products - Test N: Temperature Change Test Method
Part 2: Technical Parameters of the Product
2.1Temperature range: -40 ℃~150 ℃
Extreme temperature: -50 ℃
2.2Temperature fluctuation: ≤±0.5℃
2.3Temperature uniformity: ≤ 2 ℃ (in stable state)
2.4Cooling rate:0.7-1℃/minOverall average
2.5Test chamber workshop size:(D) 350x (W) 360 x ( H) 400(mm)
Part Three: Product Structure,Control method
3.1 Product temperature control features:
The balanced temperature and humidity control system controls SSR in a P.I.D. manner to ensure that the heating amount of the system is equal to the heat loss, thus enabling long-term stable use. Temperature and humidity do not drift. Solid state temperature control is used for temperature compensation, and the conversion between solenoid valves during cooling ensures low energy consumption of the test chamber and the anti condensation and over temperature protection functions of the tested sample.
3.2Structure and Material:
3.2.1Inner box material: T=1.5mm brushed stainless steel plate (SUS # 304), with rounded corners for a beautiful and elegant appearance.
3.2.2Outer box material: shell electrostatic spray treatment
3.2.3Insulation material: White fiberglass insulation cotton
3.2.4Supply air circulation system:
3.2.4.1 Low noise long axis circulating motor1Only.
3.2.4.2Stainless steel extended axis
3.2.4.3Multi blade fan (SIRCCO FAN)
3.2.4.4Adjustable louver air guide to ensure even temperature distribution inside the test chamber
3.3Freezing system:
3.3.1compressor:Two sets of Taikang fully enclosed compressors imported from France. (Reliable cooling performance)
3. 3.2Refrigerant: DuPont brand refrigerant R404A imported from the United States, with an ozone depletion rate of 0 (ODP=0.00)
DuPont R23 refrigerant imported from the United States has a zero ozone depletion rate (ODP=0.00)
3. 3.3Condenser: air-cooled condenser
3.3.4Evaporator: finned multi-stage automatic load capacity adjustment, multiple solenoid valve conversion, ensuring low energy consumption of the equipment. Danfoss imported expansion valve
3.3.5Other accessories: desiccant, repair valve, coconut tree brand oil separator, Italian imported Casito solenoid valve, customized plate heat exchanger
3.3.6Expansion system: automatic capacity control throttling and pressure reduction refrigeration system
3.3.7Refrigeration welding anti oxidation protection: During the welding process of the refrigeration pipeline, nitrogen gas is used throughout the welding to prevent the expansion valve from getting dirty and blocked due to internal oxidation of the copper pipe.
3.3.8Layout of refrigeration pipelines and external oxidation prevention treatment: fully considerThe layout of pipelines in refrigeration systems involves resonance during operation, loss along the refrigerant flow, ease of maintenance, and smooth recovery of compressor oil throughout the entire process. The welding points of the pipeline are protected by painting to prevent the formation of copper green, and the unwelded areas are coated with a clear varnish protective layer for a beautiful and elegant appearance
3.4Control system:
3.4.1Controller specifications:Japanese Fuji PRX-9 temperature controller, high-precision temperature controller (optional touch screen instrument)
(1) The temperature control instrument adopts LED screen display, which is easy to operate. The automatic operation function of the test chamber can be achieved by manually inputting temperature parameters.
(2) Setting accuracy: Temperature: 0 1℃
(3) Display accuracy: Temperature: 0 01℃
(4)Operation mode: Fixed value operation (optional program operation)
(5)It has the function of automatic calculation, which can immediately correct the temperature change conditions, making temperature control more accurate and stable
3.4.2Internal control circuit: The wiring of the control board is clean and tidy, and all wiring is in accordance with the relevant standards of national electrical regulations, with numbered tubes. Convenient for customers to maintain and repair in the future. The main execution components are all imported brands. Communication contactors, intermediate relays, solid-state relays, etc. are all from Schneider brand in France.
Temperature measuring body: DIN specification Class APs4mm SUS #304Stainless steel PT 100Ω1branch
3.4.3Safety device:
3.4.3.1Underphase reverse phase protection switch
3.4.3.2Compressor high voltage protection switch
3.4.3.3Compressor overheat alarm
3.4.3.4Compressor overcurrent alarm
3.4.3.5Non fuse switch
3.4.3.6Line fuses and safety terminals
3.4.3.7Buzzer abnormal alarm device
3.5Standard configuration:
3.5.1Power cord 4.0 mm2x5Rui, low impedance rubber cable, 3m long, 1 cable
3.5.21 copy of equipment electrical schematic diagram
3.5.31 test hole with a diameter of 50mm on the left side of the body, equipped with 1 stainless steel hole cover and 1 silicone plug
3.5.4One set of fuses (consumable parts)
3.5.51 set of operation manual
3.6Surrounding environment:
3.6.1Allowable temperature range 0~32 ℃
3.6.2Performance guarantee range: 5-28 ℃
3.6.3Relative humidity: not exceeding 85%
3.6.4Atmospheric pressure: 86-106Kpa
3.6.5There is no strong vibration around
3.6.6No direct sunlight or other heat sources
3.6.7There is no high concentration of dust or corrosive substances around
3.6.8The test chamber should be placed steadily and kept level
3.6.9There should be a certain distance around the test box for easy maintenance and operation
3.6.10The installation site has good ventilation
3.7Power supply: AC220V 50HZ; pre installed power: 3.5KW
Part Four: Random Technical Documentation
The random technical files include: instrument manual, certificate of conformity, warranty card, and circuit schematic, etc
Part 5: Personnel Training:The supplier is responsible for installation and debugging, training of users, and can train 3-5 people until each person can operate and perform simple maintenance independently.
Part 6 Acceptance Methods
Acceptance according to the contract and this technical specification
Part 7: After sales Service and Responsibilities
Warranty period: The whole machine is guaranteed for one year (except for damages caused by natural disasters, abnormal power, improper use, and improper maintenance, our company provides free repairs). If there are any quality problems, our customer service personnel will be on site within 8 hours and provide lifelong free technical consultation and regular maintenance reminders.
Update time: June 9, 2021 10:19:32