-
E-mail
dianlijk_com@163.com
-
Phone
13191654051
-
Address
3-303, Electric Valley Technology Center, Baoding High tech Zone
Baoding Yuxin Electric Technology Co., Ltd
dianlijk_com@163.com
13191654051
3-303, Electric Valley Technology Center, Baoding High tech Zone
The energy consumption data synchronization unit can simultaneously output 4 IRIGB codes as a unified time calibration device for the energy consumption data acquisition unit. Compared with similar products, this product has lower cost, smaller size, is not limited by signal strength, and is more flexible to use. It is a high-quality timing tool for energy consumption comprehensive management systems with a layered and distributed structure.
This product is suitable for power monitoring systems and systems with layered and distributed installation structures, helping various devices achieve data time synchronization function for distributed installation, and B-code time synchronization unitWidely used in substations, hospitals, communities, parks, schoolsAirports, shopping malls, office buildings, civil buildingsIndustrial and mining enterprisesBuilding automation system power supply network system.
Time signal input: Connect the B code timing line according to the label AB.
Power supply: Input power terminal.
Ethernet port: Ethernet terminal
NC: Reserved empty terminals
| function | Corresponding terminal | Instructions |
| power supply | PE /L/N | 100-240V/AC |
| Analog input | AN1+ /AN1- /AN2+ /AN2- /AN3+ /AN3- /AN4+ /AN4- | Input range -5V~5V |
| enter | IN1 /IN2 /IN3 /IN4 /COM | Passive dry contact, COM is the common terminal |
| issue | OUT1 /OUT2 /OUT3 /OUT4 | Passive output node |
| 485 communication | 485A /485B | Matching time unit |
| Ethernet | LAN | Connect to server |
Top view size of energy consumption data synchronization unit
