-
E-mail
cuiling2001@163.com
-
Phone
15968101676
-
Address
No. 13 Jiuxi Road, Hangzhou City, Zhejiang Province
Hangzhou Guanming Instrument Equipment Co., Ltd
cuiling2001@163.com
15968101676
No. 13 Jiuxi Road, Hangzhou City, Zhejiang Province

| Equipment model | Studio size (D * W * H) mm | Dimensions (D * W * H) mm | |
| GDCJ-100 | 450×450×500 | 1700×930×1650 | |
| GDCJ-150 | 500×600×500 | 1800×1080×1650 | |
| GDCJ-234 | 600×600×650 | 1950×1080×1950 | |
| GDCJ-512 | 800×800×800 | 2950×1450×2250 | |
| GDCJ-753 | 970×970×800 | 3130×1620×2250 | |
| GDCJ-1000 | 1120×1120×800 | 3300×1780×2250 | |
|---|---|---|---|
| Impact temperature range | A-40℃~85℃ B:-55℃~85℃ C:-65℃~85℃ | ||||||
|---|---|---|---|---|---|---|---|
| Temperature deviation | ± 3 ℃ (when unloaded) | ||||||
| temperature fluctuation | ≤ 1 ℃ (when unloaded) | ||||||
| heating rate | From room temperature to 150 ℃ ≤ 25 minutes (average throughout the entire process) (The heating time refers to the performance of the high-temperature box when operated separately) |
||||||
| cooling rate | From room temperature to -55 ℃ ≤ 45 minutes (average throughout the entire process) (The cooling time refers to the performance of the low-temperature box when it operates alone) |
||||||
| Time setting range | 1~60000M | ||||||
| Sample basket size | 250×250×250mm(100L) 600×600×500mm(512L) 300×400×250mm(150L) 760×760×500mm(753L) 400×400×400mm(234L) 920×920×500mm(1000L) |
||||||
| Temperature recovery time | ≤5min | ||||||
| Basket conversion time | ≤15s | ||||||
| Observation window | 210 × 275mm or 395 × 395mm (effective field of view) | ||||||
| send use material material |
External material | High quality A3 steel plate electrostatic spraying | |||||
| Inner box material | Imported high-grade stainless steel SUS304 | ||||||
| Insulation material | Rigid polyurethane foam+glass fiber | ||||||
| pit the heart join in marriage place |
temperature controller | Original imported temperature instrument from Japan under the brand of "Youyi Control" | |||||
| temperature sensor | PT100 platinum resistance thermometer | ||||||
| Cooling method | Double machine cascade refrigeration | ||||||
| compressor | Taikang, France/Bizelle, Germany | ||||||
| Standard configuration | 1 set of basket sample rack | ||||||
| Safety protection | Compressor overpressure overload, fan overheating, overall equipment under phase/reverse phase Overtemperature, overall equipment timing, leakage protection, overload and short circuit protection |
||||||
| supply voltage | AC380V±10% 50Hz | ||||||
| Power | (A)17kW/22kW/25kW/53kW/72kW/95kW (B)17kW/22kW/25kW/53kW/72kW/95kW (C)20kW/25kW/42kW/65kW/85kW/110kW |
||||||
| Usage environment | 5℃~+28℃ ≤85% RH | ||||||
| Note: 1. The above data were measured under good ventilation conditions at an ambient temperature of 25 ℃ 2. Customized high and low temperature impact test chambers can be customized according to specific testing requirements of users 3. This technical information is subject to change without prior notice |
|||||||